Planning updates for this neighborhood began in the fall of 2008. There were two community open houses in September (September 27 and September 30), the draft material for review and comment is posted below:
Places and Connections (Draft)
Beacon Hill Places and Connections Diagram
Built Environment Alternatives
Existing Land Use
|
Option 1: 50' with Setback Alternative (Draft)
Beacon 50' with Setback Alternative
Option 2: 65' with Setback Alternative (Draft)
Beacon 65' with Setback Alternative
Option 3: Tower Concept
Streetscapes (Draft)
Beacon Avenue Streetscape Concept
DPD has hosted previous community events in March and May of 2009. Below are reports back from those community meetings.









