Seattle.gov Home Page City Services Staff Directory [WEB GRAPHIC] About Seattle.gov City Contacts
Seattle.gov Home Page
 SEARCH: 
Seattle.gov This Department
Link to Seattle Design Commission Home Page Link to About Us Link to Contact Us Link to Design Commission Home Page Championing civic design excellence in Seattle's public realm Guillermo Romano, Seattle Design Commission Director
What We Do: Accomplishments

Visual Resume

<< back
The Grass Blades 

next >>
Beacon Hill Library


Yesler Community Center

(Photo by Juan Hernandez and Mithun.)


Facts

  • Name: Yesler Community Center
  • Goal: to replace an exisiting, outmoded community center with a facility that has space for community activities, sports, after-school care for elementary school-age kids, teen activities, classes, cultural activities and community gatherings  
  • Year Built: 2004
  • Address: 917 E Yesler Way
  • Client: Seattle Parks and Recreation
  • Designer: Mithun
  • Cost: $6,636,000
  • Size: 20,000 sq ft
  • Design Commission Reviews:
    • pre-design (June 6, 2002)
    • schematic design (September 19, 2002)
    • design development (February 20, 2003)

Design Commission's Influence
The Design Commission believed the rebuilding of the Yesler Community Center afforded the City a great opportunity to not only to better provide recreation and community facilities for the residents of First Hill but also to be a catalyst for redeveloping the area to an urban form more suitable for a neighborhood close to downtown.

The Design Commission made several recommendations for improvement to the Seattle Parks and Recreation Department and its design team:

Overall Concept and Direction

  • better define the design principles that will guide the evolution of the project's design

Urban Design and Neighborhood Fit

  • develop the design to set the future direction for a much higher density neighborhood, recognizing this extremely valuable site will be a catalyst for future redevelopment
  • avoid an inward looking scheme and seize the opportunity to make better connections between this community and the larger city, especially downtown and First Hill
  • recognize this site is an important part of the City's Blue Ring/Open Space strategy and demonstrate how the project ties into it
  • reconsider the design of the west edge as a public edge since it opens onto the end of Broadway Avenue
  • create more openess along Yesler Way

Site Planning

  • design the building so it fits the contours of both the neighborhood and site
  • design the grading on the south in the manner that fits with the delightful terrace character of the building's massing
  • further investigate how the south end of the site can be used for ecological functions
  • develop the site to accomodate the views, particularly at the intersection of Yesler Way and Broadway (which should not be used as an auto-drop off)
  • develop a massing concept and parking layout that maximizes public use of the site
  • redesign the suburban parking scheme for an urban setting, for example, by having fewer spaces, excavating underground parking, or creating a multi-use parking lot
  • reconsider the parking and plan configuratio
  • save the large trees on the site


South entry terrace. (Photo by Juan Hernandez and Mithun.)

Design Refinements

  • make the openings of windows in the brick wall along the front facade more generous
  • reexamine the design of the east-facing street wall of the gym
  • explore ways to integrate the mechanical shed more into the character of the building
  • consider ways to integrate usable, flat open space with the grade change rather than having a single, large vertical wall
  • design the interior gym space and childcare center to reflect that it is a place for children
  • better connect the circulation and social spaces with the open spaces


Street facing windows. (Photo by Juan Hernandez and Mithun.)

See other projects in the Visual Resume.

Last Updated: April 24, 2007

Next Meeting
See the agenda.

Recommendations
SR 520 Bridge Replacement
The Seattle Design Commission believes it is premature to endorse the 6-lane option for the 520 bridge replacement and that the best mobility and urban design solution might rest in a yet-to-be-developed hybrid alternative. Read the letter (10/6/2006) to the Mayor and City Council.

The Commission is concerned about the impacts of the Pacific Interchange and recommends honing a 4-Lane hybrid option for SR 520. Read the letter (10/31/2006) to the Washington State Department of Transportation regarding their Draft Environmental Impact Statement.

Public Safety Building Site Redevelopment
The Seattle Design Commission recommends the Public Safety Building site be redeveloped to create a great public space to complete the City's civic campus. Read the report (9/2006).

Waterfront Plan
The Seattle Design Commission supports the City's Central Waterfront Plan and the Department of Planning and Development as the lead agency in its development. Read the letter (2/13/2006) to the Mayor and City Council, and an earlier letter (8/17/2005).

Visual Resume

The Grass Blades
See the AIA award-winning The Grass Blades at the Seattle Center and how the Design Commission's review made a difference in the development of this project. Open the Visual Resume.

photo by Benjamin Benschneider

Annual Report
2007 Design Commission Annual report - small
2007 Report
In 2007, the Design Commission reviewed $8.99 billion worth of public projects. For details, see the commission's annual report. 

Seattle Design Commission
Seattle.gov: Services | Departments | Staff Directory | Mayor | City Council
Copyright © 1995-2008 City of Seattle Questions/Complaints | Privacy & Security Policy