Thornton Natural Drainage

  • Established_NDS A natural drainage system project a few years after installation.
  • Installed_NDS A natural drainage system before plants are installed.

Timeline

  • Early 2017

    Phase one outreach to basin residents about potential blocks.

  • Late 2017

    Phase one conceptual design for potential blocks.

  • 2019 – 2020

    Phase one anticipated construction.