Thornton Natural Drainage

  • Established_NDS A natural drainage system project a few years after installation.
  • Installed_NDS A natural drainage system before plants are installed.

Timeline

    Early 2017

  • Phase one outreach to basin residents about potential blocks
  • 2018 – 2019

  • Design development for selected sites
  • 2020

  • Anticipated construction
  • 2021

  • Project closeout