Seattle Public Utilities

Delridge Natural Drainage

drainageConceptArt

Natural drainage system cells and plantings in the South Delridge neighborhood.

Timeline

  • Summer – Fall 2013
    Route and site selection
  • Winter 2014
    Preferred alternative identified
  • Spring – Spring 2015
    Design completed
  • Fall 2015 – Winter 2016
    Construction completed