Working for a safe, affordable, vibrant, innovative, and interconnected city.
Learn More

Sunny day at Lincoln Park

Photo by CityWeb Team

  • photo #1
  • photo #2
  • photo #3
  • photo #4
 
Print this Page  
logo
City of Seattle
Ed Murray, Mayor
NEWS ADVISORY
SUBJECT: City seeks artist to develop artwork for stormwater facility in West Seattle
FOR IMMEDIATE RELEASE:
2/1/2013  10:00:00 AM
FOR MORE INFORMATION CONTACT:
Calandra Childers  (206) 684-7306


City seeks artist to develop artwork for stormwater facility in West Seattle


SEATTLE — The Seattle Office of Arts & Cultural Affairs, in partnership with Seattle Public Utilities (SPU), seeks an artist or artist team to develop a permanent, site-integrated artwork for the North Delridge Combined Sewer Overflow (CSO) Retrofit Project. The project is located in West Seattle’s Delridge neighborhood. The call is open to established professional artists residing and eligible to work in the United States. Applications are due 11 p.m., Monday, March 18, 2013 (Pacific Daylight Time). Go to www.seattle.gov/arts for a link to the online application.

Beginning in late 2014, SPU will install new hydraulic controls and active-control technology at the facility, with gates, pumps and sensors that monitor and control the amount of flow that is allowed to enter the downstream sewer system. Based on SPU’s work to retrofit the CSO tank, the selected artist will work with the CSO project design team, SPU staff and community members to design, fabricate and install an artwork at the CSO Tank 168 facility at 2106 S.W. Orchard St. The artwork should focus on the agency’s system-wide stormwater infrastructure and solutions designed to protect local water quality. The artwork should also address stormwater management as it relates to SPU’s work, the local community and natural elements of the nearby Longfellow Creek watershed. The artwork can include a variety of media including light, stone, steel, glass, sound and passive water features.

The Delridge CSO control and storage facilities were constructed in 1982 and were among the first CSO facilities built by the city. They are the city’s largest existing CSO storage facilities, with each tank providing 1.6 million gallons of sewer and stormwater overflow storage. Despite being sized to store a 10-year flood event, sewer overflows into local waterways from each facility have continued to exceed a long-term average of one overflow per year. The retrofit project’s improvements will optimize the performance of the facilities and reduce the frequency and volume of untreated stormwater and raw sewage overflows into Longfellow Creek.

The CSO project is currently in design through mid-2014 and construction is expected to begin in late 2014. Project completion is expected in late 2015. The artist will work with SPU and its consultants to develop an artwork that will be constructed within the project schedule.

The total budget for the artwork project is $200,000 inclusive of all costs to design, fabricate and install the artwork. The artwork is funded by SPU 1% for Art funds and administered by the Office of Arts & Cultural Affairs.

For more information about SPU’s sewage overflow protection programs, visit: http://www.seattle.gov/util/EnvironmentConservation/Projects/DrainageSystem/SewageOverflowPrevention.

The Office of Arts & Cultural Affairs supports the health and vitality of our city by providing access to arts and culture, advancing the role of the arts in our community, and advocating for issues that affect the entire cultural community. The 16-member Seattle Arts Commission, citizen volunteers appointed by the mayor and City Council, supports the city agency.

# # #

Back to News Release Home Page and News Release Search